Handover strategy
The RIBA Plan of Work 2013 defines the handover strategy as:
‘The strategy for handing over a building, including the requirements for phased handovers, commissioning, training of staff or other factors crucial to the successful occupation of a building. On some projects, the Building Services Research and Information Association (BSRIA) Soft Landings process is used as the basis for formulating the strategy and undertaking a Post-occupancy Evaluation.’
See: Handover construction site to the client for more information
[edit] Related articles on Designing Buildings
- BREEAM Handover.
- Building completion.
- Client commissioning.
- Completion.
- Defects liability period.
- Difference between practical completion and partial possession.
- Handover and close out.
- Handover plan.
- Initial aftercare.
- Migration strategy.
- Performance in use.
- Post occupancy evaluation.
- Practical completion.
- Soft landings.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February